Application guide
Updated: Friday, July 16th 2021
Integration Guide: Palletizing with UR
This document provides an overview of the integration and setup for a palletizing robot cell that uses a Universal Robots UR10e cobot. Upon completing the mechanical assembly of your palletizing robot cell, plan between 4-8 hours for the electrical and software configuration prior to production start.
Note that all components that surround the cobot are available on the Vention platform and are delivered as a kit.
Below is a list of topics covered in the integration guide.
Table of Contents
Item | Page |
General overview | 5 |
Mechanical installation | 7 |
Wiring | 11 |
End-of-arm tool | 21 |
Configuration | 26 |
Ewellix URCap | 26 |
Pally URCap | 30 |
Grippe, lifting column and I/Os | 31 |
Safety setup | 35 |
Verification | 36 |
Calibration & initial programming | 43 |
Additional information | 60 |
Appendix A - Vention vertical gantry | 61 |
Appendix B - Other robot end effectors | 62 |